Mid-West Building Spec Warehouse in Saskatoon’s Marquis Industrial Sector
Mid-West has started construction on a 23,000 square foot warehouse building at 821 64th Street in Saskatoon.
Since the start of construction, the building has been 50% pre-leased to Calgary-based Barewire Recycling.
Construction is scheduled to be completed in early 2025.
